| Design & Drawings |
|---|
| Architectural Layout | 2D Architectural Design Modern 3D Elevation2D Architectural Design
Modern 3D Elevation
Structural Design
MEP Drawings
All construction work to be carried out as per
approved plan
No. of 2D floor plan iteration is not a constrain. The
number of changes will be done till the floor plan is
finalized. | 2D Architectural Design Modern 3D Elevation2D Architectural Design
Modern 3D Elevation
Structural Design
MEP Drawings
All construction work to be carried out as per
approved plan
No. of 2D floor plan iteration is not a constrain. The
number of changes will be done till the floor plan is
finalized. | 2D Architectural Design Modern 3D Elevation2D Architectural Design
Modern 3D Elevation
Structural Design
MEP Drawings
All construction work to be carried out as per
approved plan
No. of 2D floor plan iteration is not a constrain. The
number of changes will be done till the floor plan is
finalized. |
|---|
| Structure |
|---|
| Structural Design & Seismic Compliance | Structure shall be designed as per IS 456, IS 1893, and IS 13920 for seismic Zone IV, with ductileStructure shall be designed as per IS 456, IS 1893,
and IS 13920 for seismic Zone IV, with ductile
detailing for safety. | Structure shall be designed as per IS 456, IS 1893, and IS 13920 for seismic Zone IV, with ductileStructure shall be designed as per IS 456, IS 1893,
and IS 13920 for seismic Zone IV, with ductile
detailing for safety. | Structure shall be designed as per IS 456, IS 1893, and IS 13920 for seismic Zone IV, with ductileStructure shall be designed as per IS 456, IS 1893,
and IS 13920 for seismic Zone IV, with ductile
detailing for safety. |
|---|
| Steel | Rathi Fe500/ Fe5504.5Kg per sqft
Any variation above and below 4.5kg is charged and
refunded on pro rata basis. | Rathi Fe500/Fe5504.5Kg per sqft
Any variation above and below 4.5kg is charged and
refunded on pro rata basis. | TATA Fe500 / Fe5504.5Kg per sq ft
Any variation above and below 4.5kg is charged and
refunded on pro rata basis. |
|---|
| Cement | Shree/Dalmia/AmbujaSame brand shall be used for all RCC, brickwork, and
plastering works. | Ultratech / ACCSame brand shall be used for all RCC, brickwork, and
plastering works. | Ultratech / ACCSame brand shall be used for all RCC, brickwork, and
plastering works. |
|---|
| Bricks | Baghpat (U.P)A Class Red Brick
External walls shall be constructed using 9-inch (4.5
inch in case of common wall) thick brickwork and
internal partition walls shall be 4.5-inch thick | Baghpat (U.P)A Class Red Brick
External walls shall be constructed using 9-inch (4.5
inch in case of common wall) thick brickwork and
internal partition walls shall be 4.5-inch thick | Baghpat (U.P)A Class Red Brick
External walls shall be constructed using 9-inch thick
brickwork and internal partition walls shall be 4.5-
inch thick |
|---|
| Concrete | M25RCC work in Slab, Beam, Column, and Foundation to
be carried out.
M25 ratio is 1:1:2 (Cement : Sand : Coarse
Aggregates).
Proper use of Vibrators and Cover Blocks in Slabs,
beams, columns and foundation. | M25RCC work in Slab, Beam, Column, and Foundation to
be carried out.
M25 ratio is 1:1:2 (Cement : Sand : Coarse
Aggregates).
Proper use of Vibrators and Cover Blocks in Slabs,
beams, columns and foundation. | M25RCC work in Slab, Beam, Column, and Foundation to
be carried out.
M25 ratio is 1:1:2 (Cement : Sand : Coarse
Aggregates).
Proper use of Vibrators and Cover Blocks in Slabs,
beams, columns and foundation. |
|---|
| Plinth, Floor and Stilt Level | Plinth is considered at 2 ft height. Floor to Ceiling Height (Clear Height) is 10 ft on firstPlinth is considered at 2 ft height.
Floor to Ceiling Height (Clear Height) is 10 ft on first
and second floors.
Stilt height as per the government norms | Plinth is considered at 2 ft height. Floor to Ceiling Height (Clear Height) is 10 ft on firstPlinth is considered at 2 ft height.
Floor to Ceiling Height (Clear Height) is 10 ft on first
and second floors.
Stilt height as per the government norms | Plinth is considered at 2 ft height. Floor to Ceiling Height (Clear Height) is 10.5 ft or asPlinth is considered at 2 ft height.
Floor to Ceiling Height (Clear Height) is 10.5 ft or as
per actuals.
Stilt height as per the government norms |
|---|
| Aggregates (Rodi) | 20mm & 10mmMost superior bluish color aggregates to be used in
all concrete work. | 20mm & 10mmMost superior bluish color aggregates to be used in
all concrete work. | 20mm & 10mmMost superior bluish color aggregates to be used in
all concrete work. |
|---|
| PCC in Foundation / Stilt and Terrace | 100mm (4 inch) thick PCC in ratio of 1:3:6 (Cement:Sand:Aggregate)100mm (4 inch) thick PCC in ratio of 1:3:6
(Cement:Sand:Aggregate)
PCC to be done below the foundation jal, in stilt area
below the granite work and also in terrace below the
terrace tile flooring | 100mm (4 inch) thick PCC in ratio of 1:3:6 (Cement:Sand:Aggregate)100mm (4 inch) thick PCC in ratio of 1:3:6
(Cement:Sand:Aggregate)
PCC to be done below the foundation jal, in stilt area
below the granite work and also in terrace below the
terrace tile flooring | 100mm (4 inch) thick PCC in ratio of 1:3:6 (Cement:Sand:Aggregate)100mm (4 inch) thick PCC in ratio of 1:3:6
(Cement:Sand:Aggregate)
PCC to be done below the foundation jal, in stilt area
below the granite work and also in terrace below the
terrace tile flooring |
|---|
| Plaster Work | Interior Plaster : 8-10mm thick with ratio of 1:2:3 (Cement:Coarse Sand:Fine Sand). Single coat plasterInterior Plaster : 8-10mm thick with ratio of 1:2:3
(Cement:Coarse Sand:Fine Sand). Single coat plaster
of 8-10mm thick would be provided.
Exterior Plaster : 12-15mm thick with ratio of 1:2:2
(Cement:Coarse sand:Fine Sand). Double coat
plaster totaling to 12-15 mm would be provided for
durability and strength | Interior Plaster : 8-10mm thick with ratio of 1:2:3 (Cement:Coarse Sand:Fine Sand). Single coat plasterInterior Plaster : 8-10mm thick with ratio of 1:2:3
(Cement:Coarse Sand:Fine Sand). Single coat plaster
of 8-10mm thick would be provided.
Exterior Plaster : 12-15mm thick with ratio of 1:2:2
(Cement:Coarse sand:Fine Sand). Double coat
plaster totaling to 12-15 mm would be provided for
durability and strength | Interior Plaster : 8-10mm thick with ratio of 1:2:3 (Cement:Coarse Sand:Fine Sand). Single coat plasterInterior Plaster : 8-10mm thick with ratio of 1:2:3
(Cement:Coarse Sand:Fine Sand). Single coat plaster
of 8-10mm thick would be provided.
Exterior Plaster : 12-15mm thick with ratio of 1:2:2
(Cement:Coarse sand:Fine Sand). Double coat
plaster totaling to 12-15 mm would be provided for
durability and strength |
|---|
| Compound Wall | 4.5 Inch thick compound wall will be provided with 6 ft height from the plinth level on open areas perimeter4.5 Inch thick compound wall will be provided with 6
ft height from the plinth level on open areas perimeter | 4.5 Inch thick compound wall will be provided with 6 ft height from the plinth level on open areas perimeter4.5 Inch thick compound wall will be provided with 6
ft height from the plinth level on open areas perimeter | 9 Inch thick compound wall will be provided with 6 ft height from the plinth level on open areas perimeter9 Inch thick compound wall will be provided with 6 ft
height from the plinth level on open areas perimeter |
|---|
| Parapet Wall | 9 inch thick wall with 3.3 ft will be provided on terrace on entire terrace perimeter.9 inch thick wall with 3.3 ft will be provided on terrace
on entire terrace perimeter. | 9 inch thick wall with 3.3 ft will be provided on terrace on entire terrace perimeter.9 inch thick wall with 3.3 ft will be provided on terrace
on entire terrace perimeter. | 9 inch thick wall with 3.3 ft will be provided on terrace on entire terrace perimeter.9 inch thick wall with 3.3 ft will be provided on terrace
on entire terrace perimeter. |
|---|
| Curing | Sika AntisolAll RCC and masonry works shall be properly cured
using continuous water curing methods to maintain
adequate moisture for hydration of cement.
Minimum 12-14 days for RCC work, minimum 10-14
days for brickwork and plaster twice a day
Columns will be covered with jute bag during curing
to retain water | Sika AntisolAll RCC and masonry works shall be properly cured
using continuous water curing methods to maintain
adequate moisture for hydration of cement.
Minimum 12-14 days for RCC work, minimum 10-14
days for brickwork and plaster twice a day
Columns will be covered with jute bag during curing
to retain water | Sika AntisolAll RCC and masonry works shall be properly cured
using continuous water curing methods to maintain
adequate moisture for hydration of cement.
Minimum 12-14 days for RCC work, minimum 10-14
days for brickwork and plaster twice a day
Columns will be covered with jute bag during curing
to retain water |
|---|
| Waterproofing | Sika/Dr. Fixit LW+ (pidilite)Concrete used anywhere is infused with
waterproofing crystalline compound
Waterproofing coat is done in wet areas like balcony,
bathrooms, underground sump
Gola is created on terrace on joint of slab and parapet
wall.
Waterproofing compound is added to external plaster. | Sika/Dr. Fixit LW+ (pidilite)Concrete used anywhere is infused with
waterproofing crystalline compound
Waterproofing coat is done in wet areas like balcony,
bathrooms, underground sump
Gola is created on terrace on joint of slab and parapet
wall.
Waterproofing compound is added to external plaster. | Sika/Dr. Fixit LW+ (pidilite)Concrete used anywhere is infused with
waterproofing crystalline compound
Waterproofing coat is done in wet areas like balcony,
bathrooms, underground sump
Gola is created on terrace on joint of slab and parapet
wall.
Waterproofing compound is added to external plaster. |
|---|
| Anti-Termite Treatment | Bayer / Terminator (pidilite)Double Layer Protection System (DLPS)
FIRST STEP : Termite soil treatment begins
preconstruction for complete building. To be done at
plinth level with Bayer & Terminator (Pidilite)
antitermite chemical.
SECOND STEP : Systematic piping network for
uniform distribution across the area. Designed for
efficiency, durability, and leak-proof performance.
TEAM AT AVRIT USES DLPS, SO AS TO ENSURE
MAXIMUM PROTECTION TOWARDS TERMITE. | Bayer / Terminator (pidilite)Double Layer Protection System (DLPS)
FIRST STEP : Termite soil treatment begins
preconstruction for complete building. To be done at
plinth level with Bayer & Terminator (Pidilite)
antitermite chemical.
SECOND STEP : Systematic piping network for
uniform distribution across the area. Designed for
efficiency, durability, and leak-proof performance.
TEAM AT AVRIT USES DLPS, SO AS TO ENSURE
MAXIMUM PROTECTION TOWARDS TERMITE. | Bayer / Terminator (pidilite)Double Layer Protection System (DLPS)
FIRST STEP : Termite soil treatment begins
preconstruction for complete building. To be done at
plinth level with Bayer & Terminator (Pidilite)
antitermite chemical.
SECOND STEP : Systematic piping network for
uniform distribution across the area. Designed for
efficiency, durability, and leak-proof performance.
TEAM AT AVRIT USES DLPS, SO AS TO ENSURE
MAXIMUM PROTECTION TOWARDS TERMITE. |
|---|
| Misc | Chicken mesh to be used in all joints of brickwork and columns and conduct areas to prevent crack.Chicken mesh to be used in all joints of brickwork
and columns and conduct areas to prevent crack.
Coverblock of appropriate thickness would be used | Chicken mesh to be used in all joints of brickwork and columns and conduct areas to prevent crack.Chicken mesh to be used in all joints of brickwork
and columns and conduct areas to prevent crack.
Coverblock of appropriate thickness would be used | Chicken mesh to be used in all joints of brickwork and columns and conduct areas to prevent crack.Chicken mesh to be used in all joints of brickwork
and columns and conduct areas to prevent crack.
Coverblock of appropriate thickness would be used |
|---|
| Assumptions | Site level should not be less than 1 ft below the road level.Site level should not be less than 1 ft below the road
level.
Foundation is considered combination of isolated and
combined footing 5 ft-6ft below the natural ground
level | Site level should not be less than 1 ft below the road level.Site level should not be less than 1 ft below the road
level.
Foundation is considered combination of isolated and
combined footing 5 ft-6ft below the natural ground
level | Site level should not be less than 1 ft below the road level.Site level should not be less than 1 ft below the road
level.
Foundation is considered combination of isolated and
combined footing 5 ft-6ft below the natural ground
level |
|---|
| Bathroom & Toilet |
|---|
| Sanitary Ware and CP Fitting | Hindware Italian CollectionPremium quality sanitary ware including wall-
mounted EWC, wash basin, shower head, and
diverter from Hindware (Italian Collection) will be
provided upto the specified value. | Jaquar/Hindware ItalianPremium quality sanitary ware including wall-
mounted EWC, wash basin, shower head, and
diverter from Jaquar / Hindware (Italian Collection)
will be provided upto the specified value. | Kohler / GrohePremium quality sanitary ware including wall-
mounted EWC, wash basin, shower head, and
diverter from Kohler/Grohe will be provided upto the
specified value. |
|---|
| Bathroom Accessories | Premium accessories including mirror, towel rod/ring,soap dish, etc., up to the specified value. | JaquarPremium accessories including mirror, towel rod/ring,
soap dish, etc., up to the specified value. | Kohler/GrohePremium accessories including mirror, towel rod/ring,
soap dish, etc., up to the specified value. |
|---|
| Bathroom Geyser | Crompton/BajajOne geyser per bathroom from reputed brands like
Crompton / Bajaj, within the defined budget. | Crompton/BajajOne geyser per bathroom from reputed brands like
Crompton / Bajaj, within the defined budget. | CromptonOne geyser per bathroom from reputed brands like
Crompton / Bajaj, within the defined budget. |
|---|
| Exhaust Fan | HavellsProvision and installation of a wall-mounted exhaust
fan for proper ventilation. | HavellsProvision and installation of a wall-mounted exhaust
fan for proper ventilation. | HavellsProvision and installation of a wall/ceiling mounted
exhaust fan for proper ventilation. |
|---|
| Bathroom Flooring | Anti-skid floor tiles (sizes: 1ʼx1ʼ or 2ʼx2ʼ) to ensure safety and durability.Anti-skid floor tiles (sizes: 1ʼx1ʼ or 2ʼx2ʼ) to ensure
safety and durability. | Anti-skid floor tiles (sizes: 1ʼx1ʼ or 2ʼx2ʼ) to ensure safety and durability.Anti-skid floor tiles (sizes: 1ʼx1ʼ or 2ʼx2ʼ) to ensure
safety and durability. | Anti-skid floor tiles (sizes: 1ʼx1ʼ or 2ʼx2ʼ) to ensure safety and durability.Anti-skid floor tiles (sizes: 1ʼx1ʼ or 2ʼx2ʼ) to ensure
safety and durability. |
|---|
| Bathroom Wall Tile | Wall tiling up to ceiling height (sizes: 1ʼx1.5ʼ or 2ʼx2ʼ)providing a clean and moisture-resistant finish.Wall tiling up to ceiling height (sizes: 1ʼx1.5ʼ or
2ʼx2ʼ)providing a clean and moisture-resistant finish. | Wall tiling up to ceiling height (sizes: 1ʼx1.5ʼ or 2ʼx2ʼ)providing a clean and moisture-resistant finish.Wall tiling up to ceiling height (sizes: 1ʼx1.5ʼ or
2ʼx2ʼ)providing a clean and moisture-resistant finish. | Italian MarbleItalian Marble wall cladding up to ceiling height
providing a clean and moisture-resistant finish. |
|---|
| CPVC Fittings | AstralComplete plumbing system using high-quality CPVC
pipes and fittings from trusted brands to ensure
longevity and leak-proof performance. | AstralComplete plumbing system using high-quality CPVC
pipes and fittings from trusted brands to ensure
longevity and leak-proof performance. | AstralComplete plumbing system using high-quality CPVC
pipes and fittings from trusted brands to ensure
longevity and leak-proof performance. |
|---|
| Shower Partition/Cubicles | — | Elegant shower partition made of 6-8 mm toughened glass, ensuring durability and modern aesthetics.Elegant shower partition made of 6-8 mm toughened
glass, ensuring durability and modern aesthetics. | Elegant shower partition made of 6-8 mm toughened glass, ensuring durability and modern aesthetics.Elegant shower partition made of 6-8 mm toughened
glass, ensuring durability and modern aesthetics. |
|---|
| Kitchen |
|---|
| Kitchen Wall Cladding Visible Areas | Ceramic / Vitrified wall tiles shall be provided in allvisible areas up to a height of 5 ft above the kitchen
countertop. | Ceramic / Vitrified wall tiles shall be provided in allvisible areas up to a height of 5 ft above the kitchen
countertop. | Ceramic / Vitrified (Italian)wall tiles shall be providedin all visible areas up to a height of 5 ft above the
kitchen countertop. |
|---|
| Kitchen Wall Cladding (Non Visible Areas) | Commercial / Waste tiles shall be provided behindkitchen cabinets (non-visible areas) to protect the
cabinets from moisture. | Commercial / Waste tiles shall be provided behindkitchen cabinets (non-visible areas) to protect the
cabinets from moisture. | Commercial / Waste tiles shall be provided behindkitchen cabinets (non-visible areas) to protect the
cabinets from moisture. |
|---|
| Kitchen Counter Granite | Polished granite (16-18 mm thick) shall be provided for the kitchen counter with double-layered nosing,Polished granite (16-18 mm thick) shall be provided
for the kitchen counter with double-layered nosing,
mounted on a 4-inch RCC slab. | Polished granite (16-18 mm thick) shall be provided for the kitchen counter with double-layered nosing,Polished granite (16-18 mm thick) shall be provided
for the kitchen counter with double-layered nosing,
mounted on a 4-inch RCC slab. | Polished granite (16-18 mm thick) shall be provided for the kitchen counter with double-layered nosing,Polished granite (16-18 mm thick) shall be provided
for the kitchen counter with double-layered nosing,
mounted on a 4-inch RCC slab. |
|---|
| Sink and Faucet | Double-bowl stainless steel sink with faucet shall be provided, ISI Brand SS304 Grade double bowl sink toDouble-bowl stainless steel sink with faucet shall be
provided, ISI Brand SS304 Grade double bowl sink to
be provided. | Double-bowl stainless steel sink with faucet shall be provided, ISI Brand SS304 Grade double bowl sink toDouble-bowl stainless steel sink with faucet shall be
provided, ISI Brand SS304 Grade double bowl sink to
be provided. | Double-bowl stainless steel sink with faucet shall be provided, ISI Brand SS304 Grade double bowl sink toDouble-bowl stainless steel sink with faucet shall be
provided, ISI Brand SS304 Grade double bowl sink to
be provided. |
|---|
| Kitchen Geyser | Crompton/BajajOne geyser per bathroom from reputed ISI mark
brands like Crompton / Bajaj, within the defined
budget. | Crompton/BajajOne geyser per bathroom from reputed ISI mark
brands like Crompton / Bajaj, within the defined
budget. | Crompton/BajajOne geyser per bathroom from reputed ISI mark
brands like Crompton / Bajaj, within the defined
budget. |
|---|
| Exhaust Fan | HavellsProvision and installation of a wall-mounted exhaust
fan for proper ventilation. | HavellsProvision and installation of a wall-mounted exhaust
fan for proper ventilation. | HavellsProvision and installation of a wall-mounted exhaust
fan for proper ventilation. |
|---|
| CPVC Fittings | AstralComplete plumbing system using high-quality CPVC
pipes and fittings from trusted brands to ensure
longevity and leak-proof performance. | AstralComplete plumbing system using high-quality CPVC
pipes and fittings from trusted brands to ensure
longevity and leak-proof performance. | AstralComplete plumbing system using high-quality CPVC
pipes and fittings from trusted brands to ensure
longevity and leak-proof performance. |
|---|
| Modular Kitchen | Modular kitchen made of Plyboard with laminates, including soft close channels from Ozone/Godrej,Modular kitchen made of Plyboard with laminates,
including soft close channels from Ozone/Godrej,
with well-designed drawers and corner solutions. | Modular kitchen made of HDHMR with premium laminates, including soft close channels from Hettich,Modular kitchen made of HDHMR with premium
laminates, including soft close channels from Hettich,
with well-designed drawers and corner solutions. | Modular kitchen made of HDHMR with premium laminates, fluted glass, PU finish including soft closeModular kitchen made of HDHMR with premium
laminates, fluted glass, PU finish including soft close
channels from Hettich/Haffle, with well-designed
drawers and corner solutions. |
|---|
| Hob and Chimney | Faber/KaffBuilt-in hob and chimney from Faber / KAFF shall be
provided within the specified budget range. | Faber/KaffBuilt-in hob and chimney from Faber / KAFF shall be
provided within the specified budget range. | Faber/KaffBuilt-in hob and chimney from Faber / KAFF shall be
provided within the specified budget range. |
|---|
| Misc | Provision for water purifier, dishwasher, and other kitchen appliances shall be provided, includingProvision for water purifier, dishwasher, and other
kitchen appliances shall be provided, including
necessary inlet and outlet plumbing points.
A bib cock shall be provided for the washing machine
in the utility area or at a location as per the
architectural drawings. | Provision for water purifier, dishwasher, and other kitchen appliances shall be provided, includingProvision for water purifier, dishwasher, and other
kitchen appliances shall be provided, including
necessary inlet and outlet plumbing points.
A bib cock shall be provided for the washing machine
in the utility area or at a location as per the
architectural drawings. | Provision for water purifier, dishwasher, and other kitchen appliances shall be provided, includingProvision for water purifier, dishwasher, and other
kitchen appliances shall be provided, including
necessary inlet and outlet plumbing points.
A bib cock shall be provided for the washing machine
in the utility area or at a location as per the
architectural drawings. |
|---|
| Doors, Windows & Wardrobe |
|---|
| Main Entry Door | 32 mm thick premium flush door shutter with polished/laminated finish, fixed on a seasoned32 mm thick premium flush door shutter with
polished/laminated finish, fixed on a seasoned
hardwood frame (marandi/sal wood), complete with
SS 304 hinges, SS tower bolts, door stopper, handle,
and all necessary fittings and hardware. | 44 mm thick premium flush / Teak door shutter withpolished/laminated finish, fixed on a seasoned
hardwood frame (marandi/sal wood), complete with
SS 304 hinges, SS tower bolts, door stopper, handle,
and all necessary fittings and hardware. | TATA Pravesh44/62 mm thick premium flush door/Teak door
shutter with polished/laminated finish, fixed on a
seasoned hardwood frame (teak/sal wood), complete
with SS 304 hinges, SS tower bolts, door stopper,
handle, and all necessary fittings and hardware. |
|---|
| Main Door Lock | Godrej / YalePremium quality digital door locks from Godrej Yale
make shall be provided, suitable for the main door
ensuring durability, safety, and smooth operation. | Godrej / YalePremium quality digital door locks from Godrej Yale
make shall be provided, suitable for the main door
ensuring durability, safety, and smooth operation. | Godrej / YalePremium quality digital door locks from Godrej Yale
make shall be provided, suitable for the main door
ensuring durability, safety, and smooth operation. |
|---|
| Internal and Bathroom Doors | Flush door shutters with laminate/paint finish, installed on hardwood frames, complete with SS 304Flush door shutters with laminate/paint finish,
installed on hardwood frames, complete with SS 304
hinges, SS tower bolts (where applicable), door
stopper, handle, and all required fittings and
hardware. | Flush door shutters with laminate/paint finish, installed on hardwood frames, complete with SS 304Flush door shutters with laminate/paint finish,
installed on hardwood frames, complete with SS 304
hinges, SS tower bolts (where applicable), door
stopper, handle, and all required fittings and
hardware. | Flush door shutters with laminate/paint finish, installed on hardwood frames, complete with SS 304Flush door shutters with laminate/paint finish,
installed on hardwood frames, complete with SS 304
hinges, SS tower bolts (where applicable), door
stopper, handle, and all required fittings and
hardware. |
|---|
| Internal and Bathroom Door Lock | Godrej / Ozone / YalePremium quality door locks from Godrej / Ozone /
Yale or equivalent make shall be provided, suitable for
internal and bathroom doors, ensuring durability,
safety, and smooth operation. | Godrej / Ozone / YalePremium quality door locks from Godrej / Ozone /
Yale or equivalent make shall be provided, suitable for
internal and bathroom doors, ensuring durability,
safety, and smooth operation. | Godrej / Ozone / YalePremium quality door locks from Godrej / Ozone /
Yale or equivalent make shall be provided, suitable for
internal and bathroom doors, ensuring durability,
safety, and smooth operation. |
|---|
| Terrace and Stilt/Staircase Entry Door | Mild steel (MS) door with primer and paint finish, including necessary fittings and locking arrangement.Mild steel (MS) door with primer and paint finish,
including necessary fittings and locking arrangement. | Mild steel (MS) door with primer and paint finish, including necessary fittings and locking arrangement.Mild steel (MS) door with primer and paint finish,
including necessary fittings and locking arrangement. | TATA PraveshMild steel (MS) door with primer and paint finish,
including necessary fittings and locking arrangement. |
|---|
| Sliding Door/ Windows | Prominence · EITIUPVC sliding doors/windows with 3-track system (2
glass panels and 1 mosquito mesh track) from
Prominence / EITI or equivalent make, complete with
all necessary fittings and hardware. | Prominence · EITIUPVC sliding doors/windows with 3-track system (2
glass panels and 1 mosquito mesh track) from
Prominence / EITI or equivalent make, complete with
all necessary fittings and hardware. | FenestaUPVC sliding doors/windows with 3-track system (2
glass panels and 1 mosquito mesh track) from
Fenesta or equivalent make, complete with all
necessary fittings and hardware. |
|---|
| Door Hinges & Stopper | 4 Stainless Steel 304 hinges for each door4 Stainless Steel 304 hinges for each door | 4 Stainless Steel 304 hinges for each door4 Stainless Steel 304 hinges for each door | 4 Stainless Steel 304 hinges for each door4 Stainless Steel 304 hinges for each door |
|---|
| Door Height | 7'6" to 8' as per approved plan7'6" to 8' as per approved plan | 7'6" to 8' as per approved plan7'6" to 8' as per approved plan | 7'6" to 8' as per approved plan7'6" to 8' as per approved plan |
|---|
| Tower Bolt | 18-24 inch, Stainless Steel Finish18-24 inch, Stainless Steel Finish | 18-24 inch, Stainless Steel Finish18-24 inch, Stainless Steel Finish | 18-24 inch, Stainless Steel Finish18-24 inch, Stainless Steel Finish |
|---|
| Modular/ WalkIn Wardrobe | Laminated finished wardrobe / walk-in wardrobeconstructed using Ply board for carcass and shutters.
All panels shall be edge-banded with PVC edge band
for durability and moisture resistance.
External finish shall be in laminate finish only. Internal
surfaces shall be finished in laminate / pre-laminated
boards. Hardware shall include soft-close hinges and
telescopic drawer channels from reputed brands
such as Godrej/Ozone or equivalent. Handles shall be
standard SS / aluminium.
The wardrobe shall include basic internal layout
comprising shelves, hanging rods, and 2 drawer
units, designed for functional storage.
Lofts, fluted glass, acrylic/PU finish, premium
accessories, and specialized fittings shall not be part
of this scope. | Laminated finished modular / walk-in wardrobeconstructed using Ply board for carcass and shutters.
All panels shall be edge-banded with PVC edge band
for durability and moisture resistance.
External finish shall be in laminate finish only. Internal
surfaces shall be finished in laminate / pre-laminated
boards. Hardware shall include soft-close hinges and
telescopic drawer channels from reputed brands
such as Godrej/Ozone or equivalent. Handles shall be
standard SS / aluminium.
The wardrobe shall include basic internal layout
comprising shelves, hanging rods, and 2 drawer
units, designed for functional storage.
Lofts, fluted glass, acrylic/PU finish, premium
accessories, and specialized fittings shall not be part
of this scope. | Fluted glass, acrylic/PU finished modular / walk-inwardrobe constructed using HDHMR for carcass and
shutters. All panels shall be edge-banded with PVC
edge band for durability and moisture resistance.
Hardware shall include soft-close hinges and
telescopic drawer channels from reputed brands
such as Hettich/Haffle or equivalent with premium
profile handles.
The wardrobe shall include basic internal layout
comprising shelves, hanging rods, and 2 drawer
units, designed for functional storage. |
|---|
| Flooring |
|---|
| Floor Flooring | Vitrified tiles in living, dining, kitchen and all bedrooms, with polishingVitrified tiles in living, dining, kitchen and all
bedrooms, with polishing | Italian MarbleItalian Marble in living, dining, kitchen and all
bedrooms, with polishing | Italian MarbleItalian Marble in living, dining, kitchen and all
bedrooms, with polishing |
|---|
| Balcony Flooring | Anti-skid tiles (2ʼx2ʼ) for balconies, with cementitious grouting.Anti-skid tiles (2ʼx2ʼ) for balconies, with cementitious
grouting. | Anti-skid tiles (2ʼx2ʼ) for balconies, with cementitious grouting.Anti-skid tiles (2ʼx2ʼ) for balconies, with cementitious
grouting. | Anti-skid tiles / Granite (2ʼx2ʼ) for balconies, with cementitious grouting.Anti-skid tiles / Granite (2ʼx2ʼ) for balconies, with
cementitious grouting. |
|---|
| Staircase Flooring | 18mm Granite shall be provided on treads and risers, with proper edge nosing and chamfering Height of18mm Granite shall be provided on treads and risers,
with proper edge nosing and chamfering Height of
the raiser would be confirmable, will be planned at
the floor plan stage. | 18mm Granite shall be provided on treads and risers, with proper edge nosing and chamfering Height of18mm Granite shall be provided on treads and risers,
with proper edge nosing and chamfering Height of
the raiser would be confirmable, will be planned at
the floor plan stage. | 18mm Granite shall be provided on treads and risers, with proper edge nosing and chamfering Height of18mm Granite shall be provided on treads and risers,
with proper edge nosing and chamfering Height of
the raiser would be confirmable, will be planned at
the floor plan stage. |
|---|
| Terrace Flooring | Anti-skid cool roof top tiles (2ʼx2ʼ) for terrace, with cementitious grouting.Anti-skid cool roof top tiles (2ʼx2ʼ) for terrace, with
cementitious grouting. | Anti-skid cool roof top tiles (2ʼx2ʼ) for terrace, with cementitious grouting.Anti-skid cool roof top tiles (2ʼx2ʼ) for terrace, with
cementitious grouting. | Anti-skid cool roof top tiles (2ʼx2ʼ) for terrace, with cementitious grouting.Anti-skid cool roof top tiles (2ʼx2ʼ) for terrace, with
cementitious grouting. |
|---|
| Stilt Flooring | 18mm Granite on treads and risers, with proper nosing and chamfering18mm Granite on treads and risers, with proper
nosing and chamfering | 18mm Granite on treads and risers, with proper nosing and chamfering18mm Granite on treads and risers, with proper
nosing and chamfering | 18mm Granite on treads and risers, with proper nosing and chamfering18mm Granite on treads and risers, with proper
nosing and chamfering |
|---|
| Skirting | 100 mm (4ˮ) high skirting shall be provided along all wall edges in respective areas, matching the flooring100 mm (4ˮ) high skirting shall be provided along all
wall edges in respective areas, matching the flooring
material (vitrified tiles / granite). Skirting shall also be
provided along staircase walls using matching
granite, with proper edge finishing | 100 mm (4ˮ) high skirting shall be provided along all wall edges in respective areas, matching the flooring100 mm (4ˮ) high skirting shall be provided along all
wall edges in respective areas, matching the flooring
material (vitrified tiles / granite). Skirting shall also be
provided along staircase walls using matching
granite, with proper edge finishing | 100 mm (4ˮ) high skirting shall be provided along all wall edges in respective areas, matching the flooring100 mm (4ˮ) high skirting shall be provided along all
wall edges in respective areas, matching the flooring
material (vitrified tiles / granite). Skirting shall also be
provided along staircase walls using matching
granite, with proper edge finishing |
|---|
| Electrical Work |
|---|
| Electrical Wire | FR grade Finolex/Polycab/Havells WiresFR grade copper wiring shall be provided with
appropriate sizing for light, power, and AC circuits to
ensure safe load handling. | FR grade Finolex/Polycab/Havells WiresFR grade copper wiring shall be provided with
appropriate sizing for light, power, and AC circuits to
ensure safe load handling. | FR grade Finolex/Polycab/Havells WiresFR grade copper wiring shall be provided with
appropriate sizing for light, power, and AC circuits to
ensure safe load handling. |
|---|
| Electrical Wire Specification | 10 sq. mm for main panels, 4 sq. mm for power and AC circuits, and 1.5 sq. mm for lighting circuits,10 sq. mm for main panels, 4 sq. mm for power and
AC circuits, and 1.5 sq. mm for lighting circuits,
ensuring safe load distribution without overloading. | 10 sq. mm for main panels, 4 sq. mm for power and AC circuits, and 1.5 sq. mm for lighting circuits,10 sq. mm for main panels, 4 sq. mm for power and
AC circuits, and 1.5 sq. mm for lighting circuits,
ensuring safe load distribution without overloading. | 10 sq. mm for main panels, 4 sq. mm for power and AC circuits, and 1.5 sq. mm for lighting circuits,10 sq. mm for main panels, 4 sq. mm for power and
AC circuits, and 1.5 sq. mm for lighting circuits,
ensuring safe load distribution without overloading. |
|---|
| Conduit Pipes & Boxes | Astral · AKGISI marked PVC conduits shall be provided, with
heavy-duty conduits in slabs and medium-duty
conduits in walls, with separate routing for light and
power circuits. | Astral · AKGISI marked PVC conduits shall be provided, with
heavy-duty conduits in slabs and medium-duty
conduits in walls, with separate routing for light and
power circuits. | Astral · AKGISI marked PVC conduits shall be provided, with
heavy-duty conduits in slabs and medium-duty
conduits in walls, with separate routing for light and
power circuits. |
|---|
| Switch & Sockets | Anchor/HavellsModular switches and sockets in white finish from
Anchor/Havells equivalent make shall be provided.
No. of switches and sockets will not be a constrain | LegrandModular switches and sockets in white finish from
Legrand equivalent make shall be provided. No. of
switches and sockets will not be a constrain | LegrandModular switches and sockets in white finish from
Legrand equivalent make shall be provided. No. of
switches and sockets will not be a constrain |
|---|
| Ceiling Fans | Ceiling fans from Havells / Crompton or equivalentmake shall be provided. | Ceiling fans from Havells / Crompton or equivalentmake shall be provided. | Ceiling fans from Havells / Crompton or equivalentmake shall be provided. |
|---|
| Split AC Provision | One provision each in all bedrooms, drawing room, and living/kitchen area. Copper piping (average up toOne provision each in all bedrooms, drawing room,
and living/kitchen area. Copper piping (average up to
10 m per AC) along with necessary electrical wiring
shall be provided. Outdoor units shall be placed on
the respective floor. | One provision each in all bedrooms, drawing room, and living/kitchen area. Copper piping (average up toOne provision each in all bedrooms, drawing room,
and living/kitchen area. Copper piping (average up to
10 m per AC) along with necessary electrical wiring
shall be provided. Outdoor units shall be placed on
the respective floor. | One provision each in all bedrooms, drawing room, and living/kitchen area. Copper piping (average up toOne provision each in all bedrooms, drawing room,
and living/kitchen area. Copper piping (average up to
10 m per AC) along with necessary electrical wiring
shall be provided. Outdoor units shall be placed on
the respective floor. |
|---|
| Downlighters | Philips · OsramDownlighters from Philips / Osram or equivalent make
shall be provided. | Philips · OsramDownlighters from Philips / Osram or equivalent make
shall be provided. | Philips · OsramDownlighters from Philips / Osram or equivalent make
shall be provided. |
|---|
| Cove Strip Lights | Philips · OsramLED strip lights from Philips / Osram or equivalent
make shall be provided in cove areas | Philips · OsramLED strip lights from Philips / Osram or equivalent
make shall be provided in cove areas | Philips · OsramLED strip lights from Philips / Osram or equivalent
make shall be provided in cove areas |
|---|
| UPS Wiring | Provision for UPS wiring shall be provided for each floor.Provision for UPS wiring shall be provided for each
floor. | Provision for UPS wiring shall be provided for each floor.Provision for UPS wiring shall be provided for each
floor. | Provision for UPS wiring shall be provided for each floor.Provision for UPS wiring shall be provided for each
floor. |
|---|
| EV Charging Point | Provision for one electric vehicle charging point shall be provided per floor.Provision for one electric vehicle charging point shall
be provided per floor. | Provision for one electric vehicle charging point shall be provided per floor.Provision for one electric vehicle charging point shall
be provided per floor. | Provision for one electric vehicle charging point shall be provided per floor.Provision for one electric vehicle charging point shall
be provided per floor. |
|---|
| Solar Electrical Provision | Provision for solar electrical system shall be included.Provision for solar electrical system shall be included. | Provision for solar electrical system shall be included.Provision for solar electrical system shall be included. | Provision for solar electrical system shall be included.Provision for solar electrical system shall be included. |
|---|
| MCB/ELCB | HavellsMCB and ELCB protection shall be provided for each
floor. | HavellsMCB and ELCB protection shall be provided for each
floor. | HavellsMCB and ELCB protection shall be provided for each
floor. |
|---|
| Earthing | Earthing shall be done using copper strip / Chemical earthing for effective grounding and safety.Earthing shall be done using copper strip / Chemical
earthing for effective grounding and safety. | Earthing shall be done using copper strip / Chemical earthing for effective grounding and safety.Earthing shall be done using copper strip / Chemical
earthing for effective grounding and safety. | Earthing shall be done using copper strip / Chemical earthing for effective grounding and safety.Earthing shall be done using copper strip / Chemical
earthing for effective grounding and safety. |
|---|
| Pillar Fancy Light | — | Decorative pillar lights for third-party areas. Maximum 4 pillars.Decorative pillar lights for third-party areas. Maximum
4 pillars. | Decorative pillar lights as per customer choice for stilt front PillarsDecorative pillar lights as per customer choice for stilt
front Pillars |
|---|
| Water Management |
|---|
| Underground Water Tank | 2000 liters per floorBrickwork underground sump shall be constructed for
each floor as a separate unit, finished internally with
commercial tiles. Waterproofing shall be carried out
using approved systems from Dr. Fixit / Sika or
equivalent. | 2000 liters per floorRCC underground sump shall be constructed for each
floor as a separate unit, finished internally with
commercial tiles. Waterproofing shall be carried out
using approved systems from Dr. Fixit / Sika or
equivalent. | 2000 liters per floorRCC underground sump shall be constructed for each
floor as a separate unit, finished internally with
commercial tiles. Waterproofing shall be carried out
using approved systems from Dr. Fixit / Sika or
equivalent. |
|---|
| Overhead Water Tank | 1000 liters per floorTriple-layer overhead water tanks of 1,000 litres
capacity shall be provided for each floor, Tanks shall
be from Astral or equivalent make. | 1000 liters per floorTriple-layer overhead water tanks of 1,000 litres
capacity shall be provided for each floor, Tanks shall
be from Astral or equivalent make. | 1000 liters per floorTriple-layer overhead water tanks of 1,000 litres
capacity shall be provided for each floor, Tanks shall
be from Astral or equivalent make. |
|---|
| Water Motor | 2 Crompton Greaves motor for each floor1 HP water pump shall be provided for each floor,
connecting individual underground sump to
corresponding overhead tank. Pumps shall be from
Crompton Greaves or equivalent make. | 2 Crompton Greaves motor for each floor1 HP water pump shall be provided for each floor,
connecting individual underground sump to
corresponding overhead tank. Pumps shall be from
Crompton Greaves or equivalent make. | 2 Crompton Greaves motor for each floor1 HP water pump shall be provided for each floor,
connecting individual underground sump to
corresponding overhead tank. Pumps shall be from
Crompton Greaves or equivalent make. |
|---|
| Rainwater Harvesting | Rainwater harvesting pit shall be constructed as per applicable government normsRainwater harvesting pit shall be constructed as per
applicable government norms | Rainwater harvesting pit shall be constructed as per applicable government normsRainwater harvesting pit shall be constructed as per
applicable government norms | Rainwater harvesting pit shall be constructed as per applicable government normsRainwater harvesting pit shall be constructed as per
applicable government norms |
|---|
| Discharge PVC Pipe | All necessary PVC discharge pipes and connections shall be provided for proper water flow, drainage, andAll necessary PVC discharge pipes and connections
shall be provided for proper water flow, drainage, and
system integration. High-grade PVC pipes of 4-inch
or 6-inch diameter, as per site conditions and design
requirements, shall be used. | All necessary PVC discharge pipes and connections shall be provided for proper water flow, drainage, andAll necessary PVC discharge pipes and connections
shall be provided for proper water flow, drainage, and
system integration. High-grade PVC pipes of 4-inch
or 6-inch diameter, as per site conditions and design
requirements, shall be used. | All necessary PVC discharge pipes and connections shall be provided for proper water flow, drainage, andAll necessary PVC discharge pipes and connections
shall be provided for proper water flow, drainage, and
system integration. High-grade PVC pipes of 4-inch
or 6-inch diameter, as per site conditions and design
requirements, shall be used. |
|---|
| Ceiling & Elevation |
|---|
| False Ceiling | POP cove false ceiling shall be provided in living, dining, and all bedrooms using Sakarni POP orPOP cove false ceiling shall be provided in living,
dining, and all bedrooms using Sakarni POP or
equivalent make, including base level ceiling. Any
additional design elements or premium features shall
be as per design. | POP cove false ceiling shall be provided in living, dining, and all bedrooms using Sakarni POP orPOP cove false ceiling shall be provided in living,
dining, and all bedrooms using Sakarni POP or
equivalent make, including base level ceiling. Any
additional design elements or premium features shall
be as per design. | POP false ceiling shall be provided in living, dining, and all bedrooms using Sakarni POP withPOP false ceiling shall be provided in living, dining,
and all bedrooms using Sakarni POP with
Wooden/Glass finish. |
|---|
| Elevation | Front side no HPL panels, basic esthetical look is taken.Front side no HPL panels, basic esthetical look is
taken.
Back side of the building shall be finished with chapai
dana and roller finish. | Wallet of 5 lakh taken for elevation Back side of the building shall be finished with chapaiWallet of 5 lakh taken for elevation
Back side of the building shall be finished with chapai
dana and roller finish. | Wallet of 10 lakh taken for elevation Back side of the building shall be finished with chapaiWallet of 10 lakh taken for elevation
Back side of the building shall be finished with chapai
dana and roller finish. |
|---|
| Safety & Security |
|---|
| CCTV Camera | CCTV camera system with basic wiring as per layout.CCTV camera system with basic wiring as per layout. | CCTV camera system with basic wiring as per layout.CCTV camera system with basic wiring as per layout. | CCTV camera system with basic wiring as per layout.CCTV camera system with basic wiring as per layout. |
|---|
| Video Door Phone | — | Video door phone system with indoor monitor for each floor and main outdoor unit at gate.Video door phone system with indoor monitor for each floor and main outdoor unit at gate. | Video door phone system with indoor monitor for each floor and main outdoor unit at gate.Video door phone system with indoor monitor for each floor and main outdoor unit at gate. |
|---|
| Paint & Polish |
|---|
| Internal Wall Paint | Asian Paints (Tractor Shyne Emulsion)2 coats will be provided over 1 layer of primer and 2
layer of putty | Asian Paints (Apcolite Premium Emulsion)2 coats will be provided over 1 layer of primer and 2
layer of putty | Asian Paints (Apcolite Royal Emulsion)2 coats will be provided over 1 layer of primer and
POP Punning. |
|---|
| Exterior Wall Paint | Berger (Weathercoat Glow)Weathercoat glow Berger will be provided on the
exterior side. | Berger (Weathercoat Glow)Weathercoat glow Berger will be provided on the
exterior side. | Berger (Weathercoat Glow)Weathercoat glow Berger will be provided on the
exterior side. |
|---|
| Putty | JK Birla Putty2 coats of putty to be provided | JK Birla Putty2 coats of putty to be provided | — |
|---|
| Polish | Melamine Polish in Matte/Glossy Finish as perowner's choice | Melamine Polish in Matte/Glossy Finish as perowner's choice | Melamine Polish in Matte/Glossy Finish as perowner's choice |
|---|
| General Aspects |
|---|
| Main Gate | Bifold MS Main Gate at front as per designBifold MS Main Gate at front as per design | Bifold MS Main Gate at front as per designBifold MS Main Gate at front as per design | Bifold MS Main Gate at front as per designBifold MS Main Gate at front as per design |
|---|
| Staircase & Balcony Railing | Staircase Railing - MS Steel designer railing Balcony Railing as per design MS CNC cutStaircase Railing - MS Steel designer railing
Balcony Railing as per design MS CNC cut | Staircase Railing - MS Steel designer railing Balcony Railing as per design MS CNC cutStaircase Railing - MS Steel designer railing
Balcony Railing as per design MS CNC cut | Staircase Railing - SS Steel designer railing Balcony Railing as per design, SS with toughenedStaircase Railing - SS Steel designer railing
Balcony Railing as per design, SS with toughened
glass |
|---|
| Vibrators | Used to consolidate layers in footings, columns, beams & roof slabsUsed to consolidate layers in footings, columns,
beams & roof slabs | Used to consolidate layers in footings, columns, beams & roof slabsUsed to consolidate layers in footings, columns,
beams & roof slabs | Used to consolidate layers in footings, columns, beams & roof slabsUsed to consolidate layers in footings, columns,
beams & roof slabs |
|---|
| Brickwork Mortar | 9" brickwork not leaner than 1:6; 4½" brickwork not leaner than 1:49" brickwork not leaner than 1:6; 4½" brickwork not
leaner than 1:4 | 9" brickwork not leaner than 1:6; 4½" brickwork not leaner than 1:49" brickwork not leaner than 1:6; 4½" brickwork not
leaner than 1:4 | 9" brickwork not leaner than 1:6; 4½" brickwork not leaner than 1:49" brickwork not leaner than 1:6; 4½" brickwork not
leaner than 1:4 |
|---|
| Soil Test | Soil Test to be done before construction. Costing is included.Soil Test to be done before construction. Costing is
included. | Soil Test to be done before construction. Costing is included.Soil Test to be done before construction. Costing is
included. | Soil Test to be done before construction. Costing is included.Soil Test to be done before construction. Costing is
included. |
|---|
| Lift Machine | Includes all civil, electrical, paint, polish, exhaust, and earthing work. Entry on all floors.Includes all civil, electrical, paint, polish, exhaust, and
earthing work. Entry on all floors. | Includes all civil, electrical, paint, polish, exhaust, and earthing work. Entry on all floors.Includes all civil, electrical, paint, polish, exhaust, and
earthing work. Entry on all floors. | Includes all civil, electrical, paint, polish, exhaust, and earthing work. Entry on all floors.Includes all civil, electrical, paint, polish, exhaust, and
earthing work. Entry on all floors. |
|---|